Managerial Research About The Construction Project Of New Campus For Zibo Worker Education College

Posted on:2014-06-22Degree:MasterType:Thesis
Country:ChinaCandidate:M WeiFull Text:PDF
GTID:2252330401984083Subject:Project management
Abstract/Summary:PDF Full Text Request
Along with the university enrollment and the development of The Times, the university campus removal and new can improve teaching hardware environment for scientific and technological progress and economic development to provide a better platform. The new campus construction work is based on the characteristics and development plan, to meet the teaching, office, study and the life needs, and at the same time, in order to improve the living conditions and living environment to provide the necessary material foundation. In recent years, with the development of our country’s higher education, the state and society to increase the infrastructure construction and building reformation investment, the schools self-raised funds investment proportion is more and more big, the basic construction project more and more. To expand constantly campus area, construction of new campus.According to Z i Bo worker education institute of new campus construction project as an example, study on schedule by the line, including the work breakdown structure, working for estimation. Using the method of Gantt chart to schedule the line management. Analyzing the uncertainty and find solutions. Then the new campus construction project schedule control research, including the schedule control system flow chart, measurement and correction mechanism, and the integration of analysis progress, quality, cost control. Finally the safeguard measures of the project schedule management is analyzed. In the organization and project management, project resource security measures, labor security arrangements Measures, the analysis of the emergency management plan schedule, etc.
Keywords/Search Tags:Project management, Schedule management, new campusconstruction, Schedule Control on, Schedule Control
PDF Full Text Request
Related items