Font Size: a A A

Research On Project Risk Management Of Changchun Warm House Construction Operation

Posted on:2013-04-12Degree:MasterType:Thesis
Country:ChinaCandidate:S F WangFull Text:PDF
GTID:2252330422452372Subject:Project management
Abstract/Summary:PDF Full Text Request
The "cold house" of Changchun City, Jilin Province, is caused by irrational heatingstructure, can not effectively meet the needs of the area of urban heating and fuel prices,user maintenance improper use of objective reasons, is the urban heating systemheatsource, transmission and distribution network as well as heating the terminal housingcaused by different problems. Trend of energy-saving combination of existing buildings inthe north, Jilin Province began building a "warm house project" in2010, Changchun City,as capital city, is the leading citie of the running of the project. This paper systematicallyexplains the basic theory of project risk management, combined with the background andcurrent situation of Changchun City "warm house project" of the project risk managementprocess for the other parts of northern China Existing Building Energy Saving ProjectRisk Management provide valuable guidance and reference.Firstly, in the analysis of the status of risk management for construction projects athome and abroad on the basis of domestic and international research literature need tocomb, to form a theoretical system of the building project risk management.Secondly, the content of Changchun City, the "warm house project" Background-Existing Building Energy Saving trends and Changchun City, the "cold house" status quo,as well as "warm house project" specific project, and finally introduced the operation ofthe "warm house project" the status quo and the need for analysis of the project riskmanagement.Again, run mainly for the "warm house project" in Changchun City in four phases-project tendering, contracts, construction, completion of the project risk identification andfactor analysis.Finally, using the method of combining quantitative and qualitative analysis to builda multi-level risk assessment system, using the analytic hierarchy Changchun City, the"warm house project" risk evaluation, ranking, further risk response and monitoringstrategies.
Keywords/Search Tags:existing building energy-saving renovation, warm house construction, theapplication of the analysis hierarchy process, risk management
PDF Full Text Request
Related items