Research On Sehedule Management Of A Microbe Testing Laboratory Construction Project

Posted on:2014-12-28Degree:MasterType:Thesis
Country:ChinaCandidate:C Y HeFull Text:PDF
GTID:2252330425976847Subject:Project management
Abstract/Summary:PDF Full Text Request
The third party lab, also names fair test lab, means that the object is out of thetwo related subjects, so it is called the third party. A lab building project is the part ofKM Group’s the food hygiene department building project. On the basis ofindependent medical test laboratory, KM Group who plans to use its ownmanagement system, technical ability, social influence and other advantages, addsfood health department and makes the company become a third party testingcompany.This paper bases on the third party inspection industry, makes schedulemanagement as the center and the integrating theory with practice as the writingmethod. Firstly, discusses the project schedule management theories and tools, fromthe practical features of the laboratory building project, in the actual planning andconstruction and experimental equipment investment in the project schedulemanagement theory and methods, through the work breakdown structures, networkchart drawing work, after the analysis of the critical path map project progress plan,and puts forward the main countermeasures of safeguard investigation projectschedule management in the project to project the actual progress of data collection,analysis and planning and progress deviation, find the cause of the schedule variance,and put forward the improvement measures, and optimize the project progress controland management, ensure the timely completion of the project in the process oflaboratory planning and construction, highlight the professionalism of the third partyindependent laboratory, as well as to the test results of objective authority.
Keywords/Search Tags:Schedule Management, Critical Path, Schedule Trace, Schedule Control, Work Breakdown Structure
PDF Full Text Request
Related items