Research On Progress Management Of X High School New Campus Construction Project

Posted on:2021-04-22Degree:MasterType:Thesis
Country:ChinaCandidate:R CongFull Text:PDF
GTID:2392330602978591Subject:Project management
Abstract/Summary:PDF Full Text Request
Senior high school education is the leader of basic education,which is responsible for further improving the national quality and cultivating students to move towards the social construction of the country.In recent years,China's senior high school education has been expanding its enrollment,and the state and the government have been increasing their investment in the infrastructure construction of senior high school campus.However,under normal circumstances,the construction of new senior high school campus is relatively heavy and complex,requiring the construction of teaching buildings and accommodation Building,canteen,observatory,volleyball court and other sub projects,the construction project has multiple characteristics.At the same time,the campus construction project is different from other large-scale construction projects,which has the characteristics of relatively fixed completion time,many participants,long construction period and huge investment.Therefore,campus construction projects put forward higher requirements for project schedule management.This paper takes the construction of the new campus of X high school as the research object,introduces the basic situation and the project management method used,according to the actual needs of the project construction management,under the guidance of the relevant project progress management theory,studies the construction progress control of the new campus of X high school,makes use of The key chain technology puts forward the schedule management optimum proposal,and evaluates the effect of the optimum proposal,so as to ensure that the construction project of the new campus of X high school can shorten the completion time on the premise of ensuring quality,cost and safety Based on the previous research,this paper uses the key chain research method,analyzes the management advantages of the key chain technology,optimizes the effect of the key chain Progress Control in line with the actual campus construction project management,and enriches the theoretical system of the campus construction project schedule management.At present,the key chain technology has been successfully applied in many industries at home and abroad,but it is rarely used in the campus construction projects in China.Therefore,the research on the Progress Control of campus building project based on key chain technology is of great practical significance to the progress control and management of campus construction enterprises.
Keywords/Search Tags:Schedule control, Work Breakdown Structure, Critical Path Method, Critical chain
PDF Full Text Request
Related items