Font Size: a A A

Research On Quality Management System Of Construction Mopanshan Reservoir Project

Posted on:2015-03-10Degree:MasterType:Thesis
Country:ChinaCandidate:Y H ZhouFull Text:PDF
GTID:2252330428467450Subject:Industrial Engineering
Abstract/Summary:PDF Full Text Request
Projects Mopanshan Reservoir water supply project as an importantlivelihood projects in Heilongjiang province was listed as "fifteen" duringthe provincial, city key construction projects, the project has a large investment,longconstruction cycle, the construction process is complex andthe irreversible characteristics, in order to improve the management level of theproject construction,the Harbin City Water Supply Engineering Co. Ltd.entrusted Chinese international engineering consulting company in project biddingmanagement assistanceservices and consulting services. MopanshanReservoirproject through the implementation of project management, can shorten theconstruction period, reduce cost, guarantee the quality of construction, and achievedgood economic and social benefits.For Mopanshan Reservoir project adopts many advanced technologiesand materials in the construction, so thedomestic scholars for the studyof the project is focused on the construction technology, few research relatestothe meteorological, environmental protection, and put to use in the operation andmanagement, sustainable development direction, the quality management problemsofthe project itself is no one paid attention. In this paper,through access to relevantinformation and found that visit, Mopanshan Reservoir Project in the constructionprocess of quality management loopholes still exist, mainly forthe quality management system exists in name only;management qualitymanagement consciousness,encounter problems mutually makingexcuses liability;construction personnel professionalquality uneven,construction procedures are not strictly enforced, the lack of thenecessary self protection measures and awareness ofself-protection; supervision staff supervision is not in place; mechanicalequipment management is not strict;the construction site in chaos. These problems are due toMopanshan Reservoir project quality management system is notperfect; organization is not reasonable, organization and responsibility is notclear; management mechanism is not perfect; the cause of security measures are notin place and so. Therefore, this paper puts forward the improvement schemeof quality management system for Mopanshan Reservoir Project, through the perfectquality management system, improve the organizational structure andfunctions, improve the management mechanism andguaranteemeasure, fundamentally solve the above problem, the quality management work inearnest.This paper is divided into four parts. The first chapter from the analysisof literature, this paper introduces the basic situation of Mopanshan ReservoirProject, analyzes the quality management and the project quality managementatpresent in the research and development trend,expounds the research background.Using the columndiagram shows the statistical data in China during the past tenyears the dam break accident, introduces the qualitymanagement problemsof Mopanshan Reservoir in the construction of engineering projects and majoraccidenthappened, reveals the importance of the project quality managementsystem and practical significance. At the same time, introduces the basic frameworkof research methods, ideas and the. The second chapter starts fromthe general situation and its original quality systemconstruction Mopanshan ReservoirProject,causes quality management problems and the use of causal analysisproblems.The third chapter in view of the above problemsand its reasons, in order to improvethe organizational structure, responsibilities of departments, division ofsoundoperational mechanism for the improvement of the object, in accord with thepractical engineering,prevention, timely correcting principle, according to thePDCA circulation process, proposes the improvement program of the qualitymanagement system of Mopanshan Reservoir project. The fourth chapter to ensurethe effective implementation of quality management systemimproved the operationsecurity measures. The improvedscheme, the proposed mechanism of management and operation of security measures can not only promotethequality management of construction project of Water Supply Engineering Co.Ltd. in Harbin City, but also can provide reference to the establishment of qualitymanagement system for domestic and similar projects, in order to solve the qualitymanagement problem of our country water conservancy construction projects inthereference, has certain practical significance.
Keywords/Search Tags:Reservoir engineering, Quality Assurance, Quality managementsystem, Operation guarantee
PDF Full Text Request
Related items