Font Size: a A A

Research On Water Resources Project Plan Based On Optimal Allocation Of Water Resources In Jidong County

Posted on:2015-01-13Degree:MasterType:Thesis
Country:ChinaCandidate:W JiangFull Text:PDF
GTID:2252330428496070Subject:Water Resources and Hydropower Engineering
Abstract/Summary:PDF Full Text Request
Water is the foundational natural resource and strategic economic resources.Thestorage and regulation situation of water resources will directly affect thedevelopment of social economy and the improvement of people’s living standard,alsowill affect the improvement of ecological environment. In recent years, with the rapiddevelopment of agriculture and industry in Jidong County, the demand for waterresources quantity is increasing day by day. According to the actual situation of waterresources in Jidong County, scientific and reasonable planning, also the using oflimited water resources will solve the water crisis, also will promote the social andeconomic development in Jidong County.By analyzing the natural and geographical conditions,status of socio-economicdevelopment, Characteristics and problems existing in the development and utilizationof water resources, Using isoline method and equilibrium analysis methods clearJidong County water resources and availability. Provides the basis for Jidong countywater resources allocation and water conservancy project planning.By applying the method of water quota of Jidong County different planning levelyears to predict the water demand and water supply, adopting statistical predictionmodel for checking. Using both basic and water saving plan for water demandprediction, conducting the supply and demand balance analysis respectively. Thegreatest demand water resources is agriculture in Jidong County, followed byindustry. Water saving scheme mainly is to improve the industrial and agriculturalwater use efficiency. Based on supply and demand balance analysis, respectively tototal amount control of water, the water use efficiency control, pollution control as ared line for optimized configuration, through configuration ease part of the basinwater shortage phenomenon.This essay based on the analysis of supply and demand balance and the optimized allocation of water resources further puts forward reasonable plans of waterconservancy projects in some basins of water shortage, such as HaDa River, GuoKuiRiver and Big Stone River and so on, to solve the problem of water recourse shortage.We can improve the existing water supply ability of hydraulic engineering or buildnew water storage project in Big Stone River or carry out XingKai Lake waterdiversion project, etc. In one word, we should make the limited water resources get amaximum benefit to promote the JiDong county’s social and economic development.
Keywords/Search Tags:water demand forecast, Supply and demand balance analysis, Optimalallocation of water resources, hydraulic project planning, Jidong county
PDF Full Text Request
Related items