Research On Risk Analysis Of110Kv Substations Construction Project In The Western Suburbs

Posted on:2013-07-18Degree:MasterType:Thesis
Country:ChinaCandidate:K P YangFull Text:PDF
GTID:2269330374964953Subject:Project management
Abstract/Summary:PDF Full Text Request
Along with the rapid economic development steadily, the electric energy needed more and more. Electric power industry is the national economy’s fundamental industry, not only in the process of economic development plays a leading role, but also promote economic and social development of the important strength. In recent years, the power supply increasingly nervous, increase the contradiction between supply and demand. To solve the contradiction of power supply and demand is increasing, the state and local government to make the investment funds to the national grid for expanding the scale and upgraded. At the end of the power grid of110kv substations is the most important link industrial production of the link. So the construction of the potential risk management is the normal operation of the power system security.Based on the analysis of the relevant literature, according to risk management theory to the western suburbs of110kv power transformer engineering projects in the potential risk in the construction, USES ahp to discriminate in the western suburbs of110kv power transformer engineering projects of all kinds of construction risk, and find out the main risk factors. And used the fuzzy comprehensive evaluation method for gray in the western suburbs of110kv power transformer engineering projects of the whole construction risk level of evaluation, the conclusion that in the western suburbs of110kv power transformer engineering projects of the whole construction risk level for intermediate level. Finally appeared in the construction process of all kinds of risk factors are given the corresponding measures.
Keywords/Search Tags:Risk assessment, Analytic hierarchy process, Aisk management
PDF Full Text Request
Related items