W Company Vessel Manufacturing Base Study On Project Schedule

Posted on:2014-08-20Degree:MasterType:Thesis
Country:ChinaCandidate:R B WangFull Text:PDF
GTID:2269330425466662Subject:Project management
Abstract/Summary:PDF Full Text Request
Project schedule management is one of the modern project management body ofknowledge, national fixed asset investment projects project progress management has becomeall the more important. Container manufacturing base project as one of the national fixed assetinvestment projects, for their in-depth system of schedule management by objectivessuccessfully completed study helps guide enterprise projects, and the progress of knowledgemanagement theory and methods be applied in practice, and has provided the national fixedassets investment project management experience.This in on container manufacturing base project for analysis of based Shang, combinedprogress management related theory and both at home and abroad research results, check outlarge related literature, on project progress plans for has in-depth research, according toenterprise itself of features established has container manufacturing base project progress planssystem, on progress plans system in the different levels, basis its management depth andmanagement content of different, take has different of progress plans developed of method. Inthe container manufacturing base in the process of implementation of the project, according tothe project schedule objectives set, combined with the characteristics of enterprise projectmanagement structure and personnel, compared with the corresponding control methodscontrol the scheduling system schedules at different levels, ensuring vessel manufacturingbase-building goals can be achieved.To improve container manufacturing base project of management level, ensure project ofsmooth implementation and project target of achieved, this made has the projectimplementation guarantees measures, from organization, and technology, and funds, andhuman resources, aspects, discusses has enterprise should given full of attention andstrengthening, and the on project implementation of importance, to guarantees containermanufacturing base project of by scheduled of progress plans smooth completed, makenational and the enterprise of investment full played role.
Keywords/Search Tags:Container manufacturing base project, Schedule development, Schedule ofcontrol, Project safeguard measures
PDF Full Text Request
Related items