| "By the quality win credibility, rely on credit extension market, rely on marketefficiency, rely on the credibility of development," which is the lifeline of modernenterprise survival and development, has been perceived by many entrepreneurs athome and abroad, for construction companies,. As the quality of life of enterprises, themagic of famous works as the market competition, the quality of management as apriority among priorities of enterprise management, has been recognized by themajority of the construction business owners, managerst, in grasping the scene"quality priority, outside the grasp market reputation to win", the business strategy ofQuality and efficiency road has been widely adopted. In this sense, the marketcompetition has been transformed into the competition of project quality. Theconstruction process of quality management control is an important part ofconstruction management, the whole construction process of the overall constructionof promoting the progress of construction technology and optimize the constructionmanagement plays an extremely important role.This article only by the studies on Datang Hulunbeier Fertilizer Limited180,000tons/year of synthetic ammonia and300,000tons/year of urea project qualitycontrol, analysis the quality control and comparison of their work before and afterimplementation, elaborates the importance of quality control in businessmanagement. By combining practical business and management needs to establishviable quality control system and to Clear datang hulun buir fertilizer co., LTD.,engineering quality control target and control method and to ensure the qualitystandard of engineering construction process and to to lay the good foundation for theproject production in the future.In this paper, a total of six parts: the first part is mainly about the researchbackground, purpose and significance, and expounds the domestic and foreignresearch dynamic, The second part mainly introduces the relevant theories of qualitycontrol management, analysis method of quality control, etc.; The third part mainlyDTH company synthetic ammonia and urea project quality control situation analysis. This paper introduces the basic information of the project, analysis the main problemsexisting in the project quality control and the cause of the problem; The fourth part isthe main part, through the analysis of various scientific methods, design a set ofpractical and effective project construction phase quality control improvementprogram, which covers the project quality control objectives, improvement of thedesign principle, basis and method, etc. The fifth part is the quality control planimplementation and performance evaluation, including the implementation steps,safeguard measures and effect evaluation, etc.; The sixth part is the article’sconclusions. |