Font Size: a A A

Analysis Of Social Stability Risk Stage Of Highway Project Feasibility Study

Posted on:2015-11-29Degree:MasterType:Thesis
Country:ChinaCandidate:Y P WangFull Text:PDF
GTID:2272330452453391Subject:Traffic and Transportation Engineering
Abstract/Summary:PDF Full Text Request
With the rapid development of our economy, more and more highlighted socialcontradictions and problems, and worsening social risk accumulation. Corruption,employment, construction quality, food safety, affect social stability problemsemerge, great impact on the stability of the society as a whole. The main originalexists in the whole event of insufficient social stability evaluation, ignoring theevent overall social stability risk assessment at first, influencing the full play of thesmooth implementation and sustainability of the event.The highway project feasibility study stage of social stability riskanalysiscontent from the project background, project plan, route, the scale ofconstruction, traffic volume forecast, the environment, and other aspects ofsocialstability risk factors, which involved a lot of risk, can effectively identify the wholeproject faces, accurate to propose targeted,effectiveness, feasibility andthe comprehensive measures of risk, avoidand reduce risk, a key role for thedevelopment of the entire project healthy, stable and sustainable play.This paper expounds the social stable stage of highway project feasibilitystudy analysis the overall train of thought, content, steps and methods,using theAHP method to determine risk index, preliminary study and the establishmentof social stability risk evaluation stage of feasibility study of highwayproject system. Based on the social stability risk of the Inner Mongolia AutonomousRegion S201line hadatu to Hailarsection of highway engineering feasibility studystage of the analysis of the project as the research object, combined with the actualproject, theevaluation index system, demonstrates that the whole process ofsocial risk analysis. The index system considers the organic combinationof legitimacy,rationality, feasibility and controllability of the project, by the methodof combining qualitative and quantitative analysis of the source of theproblemand to determine the main existence, so as to put forward theriskcountermeasures, avoid and reduce risk factors. Provide direction torelatedresponsibility main body project, to ensure the smooth implementation andoperation of the project.
Keywords/Search Tags:Highway project, risk, social stability, analytic hierarchy process
PDF Full Text Request
Related items