| Quality is one of the main control objectives of construction project management. Quality control of construction project, Require the system to effectively apply the basic principle and method of quality management and quality control, Build and run the project quality control system, To carry out the quality responsibility for the various project participants, Through the project implementation process each link quality control function activities, Effectively prevent and correct treatment may occur the project quality accidentWith the high-speed development of national economy, there is an increasing demand for energy. For energy resources is an important part of the coal electricity demand is also more and more high. Coal, as the main fuel of thermal power supply is very nervous. So to raise the efficiency, save energy, is to reflect power plant boiler combustion efficiency of fly ash carbon content and the important measure of quality of fly ash, should try to make the boiler fly ash HanTanLiang control in a reasonable range, in order to reduce pollution, improve the efficiency of the power plant.To this end, we use the PDCA dynamic quality control method for the technological transformation of power plant boiler burner quality management.(This topic comes from huaneng power international Shi Dongkou first power plant# 1~# 4 boiler combustion system renovation project)... |