The Research On The Project Management Of 220kV Shijing Substation Construction

Posted on:2016-09-09Degree:MasterType:Thesis
Country:ChinaCandidate:T LeiFull Text:PDF
GTID:2272330464974154Subject:Project management
Abstract/Summary:PDF Full Text Request
The power supply provides the most basic production and people’s life, is the people’s production and life are closely related to the public, affect the development of all walks of life. Along with our country economy development, our power has also been considerable development. Substation construction project management is a very special management means, especially the establishment of the organization, the substation construction project management body, in order to achieve efficient management and control. This paper discusses the application of project management of new substation substation construction, the use of scientific management method of engineering project, take the substation construction project earned value principle and fuzzy comprehensive evaluation method, and improve the effectiveness of project management and feasibility, the accumulation of substation construction project management experience, substation construction project management theory rich, improve the construction project management level of substation, enhance the safety management level of power construction, to ensure the substation construction project construction quality and progress of the project, reduce project cost, enhance the market competitiveness of power construction enterprises.Substation construction project schedule management has become the core content of project management. Aiming at the 220 kV Shijing substation construction project with research on substation, Shijing substation of 220 kV in details and the knowledge of project management is explained, in accordance with the substation construction project theory and the knowledge of project management as the main body, in accordance with the relevant system of project management, this paper carries out the research on the project schedule, quality, safety and cost, combined with the process of 220 kV Ishii Doub according to the principle of the earned value management, on the basis of identification, fuzzy comprehensive evaluation method and the AHP method of the 220 kV Shijing substation project quality grade. Combined with the 220 kV Shijing substation construction project of the "four control" construction, the measures, the establishment of electric power engineering project management mode optimization of organizational structure, management process and project management measures to solve the problems in the process of project control, in China and other substation provides a reference implementation.
Keywords/Search Tags:Transformer substation project, Project management, Schedule management
PDF Full Text Request
Related items