Research On The Cost Control Of Jilin Province Yingchengzi To Songjianghe Expressway Construction Project

Posted on:2016-09-29Degree:MasterType:Thesis
Country:ChinaCandidate:C Y LiFull Text:PDF
GTID:2272330467494623Subject:Project management
Abstract/Summary:PDF Full Text Request
Highway construction is the key basis for the development of all provinces,regions and provinces are actively promote the construction of the highway, in recentyears, the construction of the highway mileage and the cost is much higher. Highwayconstruction cost control is the main problem, through the research to further reducethe construction cost. With the view of the development of highway construction canattract a large number of capital inflows, leading the third industry and otherindustries into high speed development, the potential role will also graduallyrevealed.1994Chang Ping highway construction is the beginnings of the careers of Jilinprovince highway is in the midst of the highway enterprise expansion of Jilinprovince, by the end of2014the highway traffic mileage reached2252kilometers.And in the future for a period of highway construction is still an important part of theJilin province transportation infrastructure construction. The highway project costmanagement research is to adapt to the need of continuous development andimprovement of Jilin province highway career, also is to solve the budget is out ofcontrol in the process of highway construction, the defects of quality, cost andschedule disorders and an important means of all kinds of economic disputes and soon all sorts of problems.City children to camp Songjianghe highway is an important transport hub, theprovince is also an important part in the national road network planning. Camp pinehighway construction will pull the cities of Jilin province and the economic development of border areas, which makes the research on it has important practicalsignificance.This paper with the related knowledge of project cost management theory, lifecycle cost of support, to camp pine highway construction project as the researchobject, through the study on the current status of the camp pine highway cost control,from which it touches the related management department, the whole process of costcontrol system of camp will lose the cost control present situation. Based on thepresent situation of the found that the project does not reach the designated position,there is a key node control unit organization structure need to further strengthen, thelack of corresponding management measures of construction units, relativelyimmature life cycle cost control, cost, progress imbalances other problems, such asthe cost control and analyses the causes of these problems. The main reasons are: themanagement system of defects with the cost control methods, cost control problemconsciousness and ability, project units cost control lack of regulation.On this basis, in order to further reconnoiter the highway construction project costcontrol, in this paper, by analyzing the reasons and puts forward some measures,including the following:1. Further comb camp high speed the whole process of costcontrol, accurate location of the project preparation stage, the main node during theconstruction and completion date.2. The structure of this unit, should be restricted toconsider, in the decision level and execution of constrained Highway ConstructionBureau of Jilin Province set office, supervision and coordination, organization and allrelated departments respectively undertake the project entire process cost control plan,implementation, supervision, coordination, etc., providing a full range of assurance.3.Through further improve the investment estimation accuracy, optimization design,and a comprehensive contract management, whole process cost control to reconnoiterthe pine highway.4. Through the preparation period, construction and completion ofthe acceptance period of important node, find further strengthen camp pine high-speed whole process cost control implementation steps. Will each stage ofimplementation as a whole, and puts forward specific route, on camp pine highwaycost control in the whole life cycle cost control process, the use of key nodes indifferent stages of the life cycle of improvement and perfect, improve the level ofprogress and cost control as a whole.
Keywords/Search Tags:Cost control, Total life cycle cost, Earned value management
PDF Full Text Request
Related items