Design And Evaluation Of Effect On2×300MW Thermoelectric Project Plan For Bai Yinhua Coal And Electricity Company

Posted on:2016-12-18Degree:MasterType:Thesis
Country:ChinaCandidate:X L WangFull Text:PDF
GTID:2272330467494626Subject:Engineering economy
Abstract/Summary:PDF Full Text Request
White tone China coal and electricity company2x300mw cogeneration projectis the construction site is located in the eastern Inner Mongolia chifeng city, thewinter cold, heating period is longer, up to183days. Developing fast in recent years,the region heat load increase rapidly, to about200-200square meters per year onaverage speed increase the heating area, makes the original heat source unit isdifficult to meet the demand of orders, district heating, in addition, the area scatteredsmall boilers is more, about256units, bring greater environmental pollution area.Therefore, based on the current status quo, in the next few years of planning, andurban environmental protection and energy saving requirements, need to build a largeheat source projects to meet the needs of the region.White tone of China power investment group, China coal company be paid forby the company of the construction of the2x300mw cogeneration projects,according to the planning and site selection in chifeng city songshan mu ying zi town,the project according to the objective reality, installed to choose reliability, economy,operation mode and manufacturing ability are relatively mature two domestic300mwsubcritical air cooling unit, and supporting the installation have a subcriticalparameter, maximum continuous evaporation capacity of1060t/h boiler andsubcritical, rated capacity of450t/h extraction steam turbine. Mesh, after theproduction of heating load9.13million ji jiao, can solve the problem of chifeng cityarea of14million square meters of heating heating, will effectively ease the chifengcity heat supply situation of the growing tension in optimizing the allocation ofresources, reduce environmental pollution at the same time, adjust the industrialstructure, promote local economic development and social progress will play animportant role.In this article, through dialogue Yin hua district heating coal company current situation and difficulties, the distribution of the heat source, central city heat supplynetwork present situation, the heating area planning, and the heat load of chifengdistrict has the pace of development and planning requirements, bai Yin hua coalcompany intends to invest in the construction of2x300mw thermal power projectconstruction, the necessity of full investigation analysis, and according to theobjective reality, the installed solution of optimized design of the project, andconcluded after the project completed and put into operation will bring goodeconomic benefits, fully proved that the project construction is necessary and feasible.In addition, the project construction to solve the problem of the heating of the centerof chifeng city residents, namely district people’s livelihood issues, will produce goodsocial benefits.In addition, chifeng city in accordance with the overall urban planning, buildingchifeng city into infrastructure, excellent ecological environment, industry groups,personnel reasonable structure, high efficiency of the outside the city with thecharacteristic of the north is chifeng city government’s macro perspective. In order toimprove people’s quality of life, realize the benign development of the city, in chifengcity planning and construction of a large-scale heat source project, provide in chifengcity landscape change with reliable infrastructure security is required and necessary.To this end, plans to invest in the construction by the white Yin hua coal company2x300mw cogeneration project is an effective measure to improve the chifeng cityinfrastructure, accelerate the construction of the project is also the rapid developmentof chifeng city advantageous safeguard.
Keywords/Search Tags:Thermoelectric project, status quo, dilemma project design, evaluation
PDF Full Text Request
Related items