Font Size: a A A

Research On The Post Evaluation To Thermoelectric Wusu(2×330MW Units) Project

Posted on:2016-07-09Degree:MasterType:Thesis
Country:ChinaCandidate:T T MaFull Text:PDF
GTID:2322330491961854Subject:Project management
Abstract/Summary:PDF Full Text Request
Post project evaluation is an important means to enhance investor responsible.Through the investment results, the reasons for failure analysis and comparison of fair and objectively determine the investment decision-makers, managers and builders work practice problems to enhance their sense of responsibility, decision-making and management level.Post project evaluation is an extension of the project management is an important phase of the project management cycle. With the advent of peak power construction in Xinjiang, investors for future development, should control all aspects and stages of the project put forward higher requirements.Through literature review and research methods, general research methods evaluated after this paper, one of four aspects of the thermoelectric Wusu (2 X 330MW units) construction projects, namely:the implementation of the project, project effectiveness and efficiency, environmental impact and social benefits, the project objectives and sustainability, conducted a comprehensive investigation and analysis and objective comparison of project decision-making, evaluation. On this basis, establish a scientific and reasonable under each criterion, the indicators for easy operation, the design of the logical framework table and success degree evaluation form, ultimately concluded that the degree of success of the project.
Keywords/Search Tags:Project management, post project evaluation, goals, success of the project
PDF Full Text Request
Related items