Font Size: a A A

Management For The San Ba Wind Power Project Of Da Tang Renewable Energy Co. Ltd.

Posted on:2016-05-05Degree:MasterType:Thesis
Country:ChinaCandidate:J X YaoFull Text:PDF
GTID:2272330467981516Subject:Industrial engineering
Abstract/Summary:PDF Full Text Request
Wind energy is a kind of green and environmental protection can renewable energy,is one ofthe more mature technology,is as one of the important energy of the sustainable development ofthe industry to develop.Today,more than100countries on the earth for the development of wind power, theEuropean Union, the United States and China’s wind power market around the world on theoverall situation of wind power development at present stage.China’s wind power has developedrapidly in recent years,countries have to wind power as a strategic emerging industry,planningwind power installed capacity in2015reached90million kilowatts.And the current wind powerfive powers,China’s wind power resources on par with the United States,can say is thecomparison of the wind energy resource rich countries, far higher than the such as India,Germany, Spain and other countries.This paper takes datang new energy wind power project as an example,the three dam firstexpounds in three dam wind power engineering cost management present situation and existingproblems,and three dam wind projects mainly exist investment estimation of cost efficiency,andlack of design phase,such problems as lack of cost management measures in the biddingstage,analyzes the reasons of cost management has many problems,mainly including feasibilitystudy report of short of depth,the active control of engineering cost consciousness is notstrong,did not attach enough importance to the design phase of the schemeoptimization,etc,according to these reasons make cost management plan,so as to improve thethree dam wind power project cost management, save the project investment.And then was introduced in this paper,the three dam wind power project prophase costmanagement research,established in the early period of the three dam wind power projectcost management plan.First in the investment decision-making stage of cost structure and costcontrol are studied, analysis the investment decision-making phase of the cost of equipmentpurchase and installation,construction engineering, the construction of other fees,reserve fundsand construction of interest,cost control measures are put forward at the same time;Second in thesame train of thought of design phase cost structure and cost control measures areanalyzed;Finally based on bidding stage,the cost management in this phase are proposed thecontent of the need to pay attention to and study the phase of the cost management controlmethod.In the early stage of the cost management,in order to ensure the implementation ofscheme,datang new energy three dam wind power project,the author of this paper studied thecost management of the organizational structure,control process,rules and regulations.Through three stages of three dam wind power project cost management after supplement,for each phaseof the cost management step by step,let each stage in the project cost effective control,tocomplete the cost management. In all aspects.
Keywords/Search Tags:wind power, project construction, Cost management
PDF Full Text Request
Related items