Abstract/Summary:PDF Full Text Request
After the construction and development of recent years, Bayannaoer power grid dispatching communication system has been the realization of full digital optical fiber communication. At the present, Bayannaoer area and Inner Mongolia realize the information transmission through Inner Mongolia West trunk optical fiber network. The western suburbs of Linhe is an important station of the area fiber network hub contact, so a new 110 kV substation in this area can effectively improve the distribution network structure, increase the ability of power supply, improve the reliability of power supply area. The project will be located in optical transmission equipment, PCM equipment, supporting the high-frequency switching power supply and distribution equipment in substation 110 kV new bonded Park, increase the light transmission equipment in the area corresponding to the tone and day Jitai 220 kV substation.So it is significant to study the construction of Substation by technical and economic method.This paper mainly by collecting a large number of relevant materials, on the basis of relevant theories of intelligent substation, Linhe bonded zone 110 kV substation theoretical basis for engineering construction. Then, combining bayinnaoer city and the present situation of Linhe grid bonded zone, by adopting natural growth and new big load method of power load forecast related areas. In Bayinnaoer 110 kV power grid planning, under the guidance of thinking of Linhe bonded zone for the construction of 110 kV substation from the two aspects of site selection and construction scheme were analyzed, and puts forward the Linhe bonded zone the necessity of the construction of 110 kV substation. Finally, on the basis of the theory of technical economics, the bonded zone Linhe awakened 110 kV substation construction technical analysis and economic analysis. Among them, the technical analysis consists of electrical and electrical secondary two parts; Economic analysis is mainly investment estimation and economic indicators analysis, selected the net present value, payback period and financial internal rate of return of three indicators, further proved the feasibility of the project.Linhe bonded zone for the construction of 110 kV substation can effectively improve the distribution network structure, increase the power supply ability, improving power supply reliability. In this paper, the intelligent substation of 110 kV in the Linhe bonded zone construction is analyzed from the aspects of technology and economy, also for later to provide experience for the further development of intelligent substation.
Keywords/Search Tags:Substation, technical design, economic analysis
PDF Full Text Request
Related items