Font Size: a A A

Operation Management Evaluation Of The Shilianchang Industrial Waste Heatpump Heating Project

Posted on:2016-04-19Degree:MasterType:Thesis
Country:ChinaCandidate:Y N TianFull Text:PDF
GTID:2272330470974972Subject:Project management
Abstract/Summary:PDF Full Text Request
To improve the operation management abilities of the Shilianchang industrial waste heatpump heating project and find the shortcomings of the heatpump heating project in operation management, this article established the evaluation indexes system of the Shilianchang industrial waste heatpump heating project based on the industrial waste heatpump heating project characteristics and the balanced scorecard theory. The operation management of Shilianchang industrial waste heatpump heating project was evaluated by the evaluation indexes and fuzzy comprehensive evaluation model this article established. The evaluation results are basically in conformity with the actual situation. The results can verify the effectivaness and feasibility of the evaluation indexes system and fuzzy comprehensive evaluation this article established.The set of evaluation theory and process is significant for instructing the later industrial waste heat pump heating project management practice.The article is divided into seven parts, the first part introduced the research background and significance of this article and the related theory research status were summarized; the second part introduced the operation management theory, the balanced scorecard theory; the third part introduced the basic knowledge of the industrial waste heatpump heating project, and deeply analyzed the operation management present situation and existing problems of the Shilianchang industrial waste heat pump heating project operation management present situation and existing problems;the fourth part established the operation management evaluation indexes system according to the financial dimension, internal operation dimension, learning and development dimension;the fifth part firstly proposed a calculation method of the indexes weights based on two dimensional semantics data, then established the operation management fuzzy comprehensive evaluation model for the Shilianchang industrial waste heatpump heating project; the sixth part evaluated the operation management of the Shilianchang industrial waste heatpump heating project and gived some countermeasures and suggestions according to the evaluation results;the seventh part gived conclusion and prospect of full article.
Keywords/Search Tags:operation management, heatpump, heating project, two dimensional semantics data, fuzzy comprehensive evaluation
PDF Full Text Request
Related items