Font Size: a A A

Research Of Power Grid Planning And The Construction Of Distribution Automation In Jinggangshan Ciping Town

Posted on:2016-09-16Degree:MasterType:Thesis
Country:ChinaCandidate:X W WangFull Text:PDF
GTID:2272330470975903Subject:Electrical engineering
Abstract/Summary:PDF Full Text Request
Jinggangshan Ciping town is the red tourism reception center of Jinggangshan city, is the sacred place of the revolution, the red tourism resort, 5A level scenic spots, undertakes the national many major tourist reception and conference reception tasks, it is the important level of security zone in Ji’an city,what’s more,it is the National Tourism Leisure town.Therefore, to carry out Jinggangshan Ciping town power grid planning and distribution automation construction work to promote economic and social development of Jinggangshan Ciping town to improve the power supply capacity, and the reliability of power supply, the successful completion of the annual task of political security, has very important significance.This paper first introduced the research background and significance, the domestic and foreign research status of city power grid planning, and then through the description of the foundation of Jinggangshan Ciping town in economic and social development and in-depth analysis on the current situation of power grid, combining the function orientation of Jinggangshan Ciping town, many factors related to the load forecasting method, spatial load forecasting method for long-term load saturation Jinggangshan Ciping town using regression analysis forecast.On the basis of load forecasting, combined with the requirements of the new urbanization construction of distribution network function form, put forward the principles and objectives of Jinggangshan Ciping town power grid planning. At the same time according to the power balance, the rational planning of 110 kV in Jinggangshan Ciping town and the following grid, including grid structure planning, substation planning, capacity planning, distribution planning, distribution automation construction effect analysis etc. Finally, according to the planning results, put forward some supplementary planning proposals to improve Jinggangshan Ciping town power grid layout, and the next step for the future.
Keywords/Search Tags:New urbanization, power grid planning, load forecasting, distribution automation
PDF Full Text Request
Related items