Project Cost Control On The East Riverside Road Of The Tong Zhou North Canal

Posted on:2016-08-22Degree:MasterType:Thesis
Country:ChinaCandidate:M CaiFull Text:PDF
GTID:2272330473463077Subject:Project management
Abstract/Summary:PDF Full Text Request
Project cost control is one of three control projects. Cost control is very important for the smooth progress of the project. If time ris managed improperly, it could lead to waste of resources, or even affect the project’s achievement. For the duration of risk management, except the activities on the critical path, activities of non-critical path impact on the whole duration are also needed to be considered.Firstly, this essay compared the factors of the the cost control, improved depth duration of Earned value analysis、Activity based classification、Factor analysis and Value engineering of cost control, reflecting the accuracy of the calculation. Afer finding the methods and reasons of the cost control of the road project, it can make us clear that we must make some cost control measures to make the cost controling better. The cost control measures are: making the planning and design more reasonable, improving the system of cost control management, reinforcing the idea of the economy, setting up the cost control consciousness, strengthening the cost management of quality and schedule.Based on the cost control of the east riverside road of the Tongzhou North Canal,this essay put forward the reasonable and feasible recommendations for cost control managemnet, which is significant for cost control management in road projects.
Keywords/Search Tags:Road project cost control, Earned value analysis, Activity Based Classification, Factor analysis, Value engineering
PDF Full Text Request
Related items