Research On Progress Of Construction Control Of Weifang Metro Project

Posted on:2014-01-02Degree:MasterType:Thesis
Country:ChinaCandidate:L LiuFull Text:PDF
GTID:2272330473954142Subject:Project management
Abstract/Summary:PDF Full Text Request
In the progress of the project control process, it is necessary to note that it is a dynamic and continuous process control, project progress control on this issue, it is necessary to advance the progress of control, but also progress control during and after the threeare indispensable. Products produced by the construction industry, both on the functional requirements, structural requirements for the construction industry in terms of product, its progress requires both functional progress requirements, it also includes the structural requirements of the progress progress is more comprehensive, which also determines the project in order to make progress management, must teamwork, multi-party oversight alone manages the power of one person is not enough, the construction team of creative, cohesion and control the progress of the construction work, play a huge role.This article to the Weifang times Metro construction project, for example, to discuss the progress management theories specific use in the project, put forward the proposal to rationalize the progress of similar construction projects management play a useful reference This article consists of six parts, the first part of the introductory section, the main research background and significance of the project, relevant research status at home and abroad, the main research framework, research methods and technology roadmap, innovation and inadequate; second part works The project schedule control theoretical overview, including an overview of the project progress control, project progress control principles and methods as well as the progress control plan. The third part is the Introduction to Weifang era Metro project, including project construction background, an overview of the characteristics of the construction program analysis. The fourth part is divided into the the Weifang era Metro construction project progress control preparations, including project work breakdown structure, project organization is set, the arrangement of the functions of the organization of the project, the progress of the project control system set content. The fifth part of the control process for the the Weifang era Metro construction project progress, including the progress of the project plan, project schedule control programs. Part VI Conclusion and Outlook section.
Keywords/Search Tags:project management, schedule control, schedule
PDF Full Text Request
Related items