Research On Schedule Management Of Single-phase Energy Meter Automatic Verification Pipeline Project Of Z Power Supply Bureau

Posted on:2020-05-03Degree:MasterType:Thesis
Country:ChinaCandidate:Y LaiFull Text:PDF
GTID:2392330596495642Subject:Project management
Abstract/Summary:PDF Full Text Request
In recent years,the development of China's manufacturing industry has encountered many problems,the more prominent is the rising cost of labor and the increasing pressure brought by the appreciation of the RMB,which has greatly affected the profits of enterprises.Enterprises urgently need to find new breakthroughs,reduce costs and increase efficiency,hoping to fundamentally enhance the core competitiveness of products,therefore,the development of automation has become the only way.But it is not easy to introduce automation production line.There are high investment cost,strong technical complexity and other uncertainties.Therefore,it is necessary to carry out effective monitoring and management for the introduction of automation project.At present,project management has many advantages,can improve the efficiency of project management,has been widely applied to all walks of life.In project management,schedule management is an important component,which is related to the success or failure of the project.Firstly,this paper summarizes the single-phase energy meter automatic verification pipeline project of Z power supply bureau,lists the problems and difficulties in the process of project schedule management,and according to the related theory of project schedule control,studies the schedule planning of the single-phase energy meter automatic verification pipeline project of Z power supply bureau,as well as the optimization and control of the schedule in the process of project implementation.In the aspect of project schedule planning,this paper analyzed the definition of project activity,activity decomposition structure,activity sequencing principle,resource allocation method and project activity cycle,and worked out automatic verification pipeline project schedule.In the aspect of project management schedule optimization,combined with project network chart and Gantt chart,this paper analyses the tasks on the critical path of project schedule,optimizes theproject implementation schedule by compressing schedule method,rush-up method,re-estimating time method and pre-start method,analyses and compares the original project plan and the improved project plan,and re-establishes the project schedule.In order to achieve the efficient operation of project schedule management and ensure the improvement effect of project schedule.Through the practical application of project schedule management,the single-phase energy meter automatic verification pipeline project of Z Power Supply Bureau has been successfully completed.Finally,the paper summarizes the relevant research results and experience in the progress management of the single-phase energy meter automatic verification pipeline project of Z power supply bureau.The research methods and project practice experience used in this paper have an important guiding role for the future projects of Z power supply bureau,and also hope to be popularized and applied in the project schedule management of other units or organizations.
Keywords/Search Tags:Project Schedule Management, Automatic Pipeline Project Schedule, Project Schedule, Project Schedule Control
PDF Full Text Request
Related items