| The advance of the time, with the continuous development of science and technology at home and abroad, the project is divided into each stage, and system integration engineering general contracting model become a new way, but also the whole project in a heavy weight. More and more intelligent engineering to make the management more convenient, more reasonable to control all system, sharing all the information. With weak systems integration of the overall contract, information sharing, management and sharing made more successful experience, for taxpayer School of integrated construction system to pave the everything ready.The through research analysis the Zhuanghe taxpayer school new and old office building system integration management, through the analysis of the taxpayer school new and old office building weak current engineering, to study how effective overall management of weak electricity system, the owners, construction units, the property management unit, production supply of goods is more reasonable, normative, standardized. Ensure supplier product quality and installation, reduce risk, reduce the omission, to ensure proper implementation of Zhuanghe taxpayer school new and old office building system integration project.First of all, the realization of intelligent function of each subsystem, two office buildings meet the needs of managers, and then the integration between the various subsystems, meet the highest standards of management requirements, such as building control system and patrol system, building control system and fire alarm system, the overall construction of all subsystem integration in order to achieve the function of management, integration needs. Each subsystem, can be more effective to manage the overall construction of all kinds of events, first, can save manpower and material resources, second, improve the overall construction of security measures, the third, and most important, integrated interface to make it easy to manage more effectively deal with the situation, to avoid unnecessary loss and damage.The new and old office building, this paper focuses on the taxpayer school pre construction, network cabling, monitoring of multi points control, patrol system perfect, new and old office building management sharing, and combined with the optimization principle of weak systems integration projects, focus on the construction process analysis, construction stages, equipment optimization of coordination, the duration of the assurance measures and installation and commissioning of the assurance measures, strengthen taxpayer school system integration construction mode of philosophy, fully reflect the weak systems integration of related responsibilities, solve complex technical docking, to ensure the highest standards of integrated construction system. |