Study On The Cost Control Of Chulai Glass Construction Project

Posted on:2016-10-18Degree:MasterType:Thesis
Country:ChinaCandidate:J MaFull Text:PDF
GTID:2272330503455214Subject:Business Administration
Abstract/Summary:PDF Full Text Request
The main purpose of this study is the earned value method and its theory research and optimization, and applied to the engineering project cost control in the process, in order to improve the efficiency of engineering project cost control. The profit and loss is closely related to the level of cost control of the project, for any project, the ultimate goal is through a series of management means to achieve good economic and social benefits, so project management is the important content in the cost control.Firstly, this paper introduces the cost control of engineering project in glass industry research significance and background, and domestic and foreign research present situation, and expounds the basic theory: analysis of the composition of the construction cost of the project, meaning, basis and the cost control method is introduced, further analysis the complementary relationship of the construction project cost control and schedule, quality, construction safety, and points out that the relationship between coordinate the three must, in order to better cost control and the cost control has laid a theoretical foundation.Secondly, to Chu Lai glass project general situation, background, characteristics were comprehensive introduction and analysis, put forward to project manager for five organization structure management system core. According to Chu Lai glass project,the available data, the time schedule table, to Chu Lai glass project construction on both sides of the contract to carry on the elaboration, decompose the target cost of the core of civil engineering construction, pave the way for the deviation analysis.Again, with Zhu Lai glass project construction cost control principle and cost control targets, to the joint workshop of the furnace steel structure manufacture and installation engineering construction data as an example, based on the earned value method of cost control analysis of related parameters and the establishment of model,combined with the whole data draw from Chu Lai glass project construction cost control graph, according to the figure of the deviation of the cost analysis, and designsthe in the different stages of the construction cost control scheme for the problems found in the design, take real-time correction, to ensure that the project cost expenditure in the controllable range.Finally, the project cost control of the project, from the microscopic point of view of the whole process of cost control, as well as the macro perspective of the department construction and system, put forward the project cost control measures.
Keywords/Search Tags:glass project, construction costs, earned value method, cost control
PDF Full Text Request
Related items