Risk Management Of World Bank Loan For Reconstruction Of Santai County Hospital

Posted on:2017-05-02Degree:MasterType:Thesis
Country:ChinaCandidate:Q GuanFull Text:PDF
GTID:2279330485985256Subject:Project management
Abstract/Summary:PDF Full Text Request
Wenchuan earthquake occurred, causing heavy casualties and huge economic losses. According to statistics, in the earthquake, the Sichuan provincial health system 10 386 medical and health institutions damaged houses damaged 6.71 million square meters, the equipment damaged 58,116 sets (pieces), economic losses totaling 9,338,490,000 yuan. The medical and health institutions is to carry out post-disaster emergency relief, recovery and reconstruction of essential infrastructure. Therefore, how quickly and efficiently to the earthquake damaged health facilities disaster recovery and reconstruction project is particularly important.In this paper, the reconstruction of the three county hospitals for the study, the World Bank loan for the whole process of risk management characteristics were analyzed, which differs from the results of other projects proposed for World Bank Loan Project risk the whole process may exist research theme management. First, the background, significance and research status of risk management research at home and abroad are described, and on this basis, the proposed research contents, methods and technical route. Secondly, the loan project risk management theory to sort out for the subsequent reconstruction of the World Bank loan Santai County Hospital theoretical basis of risk management. Then, in the reconstruction of Santai County Hospital study, using the initial risk list, expert investigation and site survey before their loans, as well as the implementation of the whole process of risk identification summary evaluation stage, and on this basis, the use of fuzzy network analysis method to assess risk identification, and then rebuild the county hospital before the project identified three loans for a World Bank loan disaster, the possible risks of project preparation, project evaluation and project negotiations; implementation of the project schedule, quality, safety and Financial risks that may exist; summary and evaluation stage final acceptance record archiving risks that may exist, namely the development of the construction risk control measures for their effective management in order to reduce the reconstruction of the World Bank loan purpose Santai County hospital risk.Finally, the work done by this paper and future research directions are summarized.
Keywords/Search Tags:World Bank Financed, Post-disaster Recovery and Reconstruction, Medical and Health Facilities, Risk Management
PDF Full Text Request
Related items