Font Size: a A A

Research On Risk Management Of Construction Project Of Yongxing Town Primary School

Posted on:2016-06-11Degree:MasterType:Thesis
Country:ChinaCandidate:B GuoFull Text:PDF
GTID:2297330467497711Subject:Project management
Abstract/Summary:PDF Full Text Request
Schools in disaster area reconstruction project belongs to the governmentinvestment projects, which has its own characteristics in practice.the significance ofthis study Is a clear understanding of how the application in government investmentproject risks in engineering construction management and general practitioners ineveryday situations how to deal with these risks. Through the process of riskmanagement theory with the concrete practice of comparison, to discuss thesimilarities and differences between the two, in Yongxing town primary schoolconstruction projects carried out in-depth research, to understand some of the actualsituation of the project risk management process, the first-hand materials, the use ofqualitative and quantitative methods in the research process of combining, methodcombining theory with practice, in the specific operation is adopted in the evaluationmethod of practical technical principles and financial system, according to thespecific problems are solved properly.This study carried out in-depth research based on Yongxing primary school inthe town of construction projects, master basic construction projects, especially thespecific circumstances related to the project risk management; Risk analysis ofYongxing town primary school building in the project schedule and risk management;Through the concrete implementation of the construction project, the research of dailyoperation practice project, thus study on comparison of different stages in the projectprocess, changes in risk management elements, through the completion of theimplementation of risk management method to improve the project.This paper first introduces and analysis illustrates the significance andbackground of this research on risk management of Yong-xing primary school in thetown after the construction of the project, and introduces the research methods in this paper.The second chapter discusses the factors of project risk identification.The third chapter scientifically judging the level of risk, as in the project riskmanagement basis.The specific implementation measures in the fourth chapter, Yongxing townprimary school construction project risk management in the post.This research through the concrete implementation of the construction project,the research of daily operation practice project, comparison of different stages in theprocess of the project, changes in risk management elements, through the completionof the implementation of risk management method to improve the project. Throughthe discussion of risk identification of Yongxing town primary school constructionprojects, scientific decision level of risk factors, to provide the basis for riskmanagement in the project, and discusses the specific measures for theimplementation of the construction project risk management.Through the effective management of scientific evaluation, each have a definiteobject in view of engineering project risk factors, based on the complete constructionof a project goal and to successfully achieve the intended purpose of the project.
Keywords/Search Tags:The post disaster reconstruction projects, Project management, Riskmanagement
PDF Full Text Request
Related items