Research On Cost Control Of Datang Chifeng Company Wind Power Project

Posted on:2017-02-01Degree:MasterType:Thesis
Country:ChinaCandidate:Y Q LiuFull Text:PDF
GTID:2309330485488943Subject:Project cost management
Abstract/Summary:PDF Full Text Request
In today’s world non-renewable energy quickly dried up, wind power, as a kind of alternative energy begins to be widely attention, from the perspective of the development of wind power, in the first place in the west began to be development and utilization, and let them get the very big gains. Since the beginning of China’s wind power capacity in 2007 strong growth momentum, keep more than 100% of the annual rate of growth which made a lot of developed countries. By the end of 2015, China’s installed wind is irreversible ranked first, wind power installed capacity has reached 145.1 GW, accounting for 33.6% of the world’s total wind capacity, leading all the developed countries. This to our country in economic development, the degree of dependence on non-renewable energy will be greatly reduced. By the end of 2015 China’s power generation units installed 1.49 billion kw, the thermal power installed capacity of 1.0115 billion kilowatts, accounted for 67.9%, the proportion of thermal power installed in the power-generation sector to reduce gradually, this also means that the non-renewable energy saving and energy structure in our country remains to be further adjustment, adjust the energy structure of the thermal power is too concentrated, also social a blue sky and the beautiful natural environment.Today of global developing wind power, in order to obtain higher yields, wind power construction project cost control as the key determinants of winning. Before each wind power project construction, will go through a strict feasibility study and argumentation, earnings forecast, formulate scientific and reasonable quality plan, only in this way can the incentive of the wind power market competition have absolute advantage. Although wind power in China in recent years developing very rapidly, but the high construction cost, the yield of expectations after the completion of the project has a limit, the limit of hindered the development of wind speed. And our traditional power projects are thermal power, from the aspects of capital cost to wind power and thermal power contrast, under the same size, the cost of wind power cost is the cost of thermal power cost twice as much, but for the use of clean energy has become an irreversible trend and tendency, therefore, to study how to reduce the cost of wind power project is a new topic in front of us, this topic research results directly determines the future profitability of the wind power project and project construction decision-making, and the development of wind power in the future and long term will have strong economic effect and the field value.This paper takes datang chifeng company Abraham mountain project as the research object, through Abraham mountain project location, total quantity of project construction tasks, the early stage of the project feasibility study conclusion to briefly introduced the basic situation of the project; In addition from the project cost chart and project budgetary estimate of analyzed the key factors affecting the cost, in order to find the key factors to reduce costs; In the process of analysis, also found that the rare mountain project cost control problems, such as the early stage of the project development cycle is too long cause phase cost is too large, the cost of capital spending; Design stage time is too short, the project company’s participation is not enough, the fan price and quality does not match, the equipment is not present in time period too short construction schedule, project construction tension cost is too high, wide Zheng De Fei standard change and contract execution is not strict, lack of scientific and orderly in the management of the construction site, and so on. Again through the problem analysis considering the corresponding solution, respectively from the early stage of the four stages, design, procurement, construction formulated solutions one by one, at last, by supervision and safeguard measures to effectively implement solution, ultimately achieve radically reducing the cost of the project and increase the investment purpose of future earnings.The purpose of this study: first, increasing the datang chifeng company in the competitive power of the wind industry; Second, to reduce the datang group, wind power cost in five wind power construction group remained high rank, reduce cost for subsequent wind power project cost weibo what; Third, to study wind power project cost control research now and in the future to provide certain theoretical basis and research value.
Keywords/Search Tags:Wind power generation, Cost structure, cost control
PDF Full Text Request
Related items