| With the accelerated pace of China’s power grid construction, how to improve the power transmission project management level, especially risk management, reduce investment risk, enhance economic efficiency, it has important practical significance. According to the characteristics of power transmission project construction and management mode, and learn from the experience of power transmission, the State Grid Corporation proposed suppliesmodel "the headquarters of Manpower, professional firms, territorial division of the company responsible for the province, co-operation". Expectations through continuous exploration, supply management level power transmission project in China reached advanced materials.Author fully understand the power transmission material supply management research at home and abroad, combined with practical experience of participation in the "500kV xibaipo project", and this paper combined theoretical research and empirical Power Transmission Engineering Material Supply Management.First of all, introduce the concept of materials, meaning risk management, risk identification methods, risk assessment methods and risk control measures. Then through the process of research on power transmission project supplies, combined with material supply risk management theory, the article identification variable transmission electrical engineering material supply risk. And analyzed using the scientific method, clear the key points and the direction of power transmission project management risk prevention supplies.Followed by an empirical analysis 500kV xibaipo engineering, paper designed a set of scientific material supply management. And assessment and prevention risk with subjective score. Concludes and optimize the general rules for supplies of risk management, the paper proposes policy recommendations supplies power transmission project risk control, with some reference value. |