Font Size: a A A

A Post Evaluation Study On Depot New Project Of Luoyang

Posted on:2017-09-21Degree:MasterType:Thesis
Country:ChinaCandidate:Z T ZhaoFull Text:PDF
GTID:2321330566956636Subject:Project management
Abstract/Summary:PDF Full Text Request
In modern times,oil has always been important energy and strategic materials to ensure and promote the sustained and rapid development.Because the eastern and western regions of oil resources imbalance,"West-East oil" projects imperative.Zheng ~Lan ~Chang pipeline built for the Northwest region of petroleum products Sinotrans has opened up a new channel,as well as pipeline through Gansu,Henan,Hubei and Hunan and other areas to provide a reliable oil resources.As well along the supporting construction of Depots,China National Petroleum Co.,Ltd.Luoyang Henan Branch Depot for supporting transformation,New and renovation project is divided into Luoyang Luoyang oil Depot tank works two commercial projects.Carry Luoyang Depot New project evaluation,not only to summarize the experience and lessons of construction projects,but also for the subsequent construction projects can provide decision-making basis for decision-makers to improve its decision-making level,to ensure the project investment.Evaluation Index System and method for determining Luoyang Depot New project is the basis for evaluation.This paper aims to establish a reasonable evaluation index system and select practical evaluation method for oilfield ground engineering project post evaluation.Drawing on relevant areas of domestic and foreign research results on post-evaluation based on the Depot project combines the features characteristic for ground engineering projects,the use of quantitative and qualitative analysis,theoretical research and case study method of combining research.In the index system based on the principle,three index system was set first,the entire project will be divided into pre-project,project implementation and project implementation results in three areas as an indicator to determine the direction of the evaluation,and then two indicators subdivided into goal attainment,preparatory work,construction and implementation,production and operation situation,financial benefits,environmental impact,social impact,sustainability,etc.8 refinement indicators to determine the Luoyang Depot New project evaluation of the content.Again based on a comprehensive,systematic,representativeness,intuitive operability principles,we initially established third of evaluation.Finally we take Luoyang Depot New projects as a case study,and give suggestions.
Keywords/Search Tags:Depot New, project evaluation, index system
PDF Full Text Request
Related items