The Implementation Phase Of The Project To Change The Price Of Research Projects

Posted on:2015-03-25Degree:MasterType:Thesis
Country:ChinaCandidate:L B ZouFull Text:PDF
GTID:2322330470472308Subject:Architecture and Civil Engineering
Abstract/Summary:PDF Full Text Request
With the rapid development of China's economy, the growing prosperity of the construction industry, our research efforts to standardize the construction market is constantly increasing. However, due to the standardization of the research on the construction market started late, so the project changed in a very long time without attention construction projects parties. In order to provide a construction unit and construction companies under contract template how to properly manage engineering change ideas and approaches, in order to safeguard the interests of the construction unit and construction companies to the maximum extent, paper uses qualitative and quantitative research methods in order to gradually progressive elaboration way to price the project after the change, and how to adjust the calculation related issues were discussed:Paper describes the construction works in the project caused by engineering changes occur reasonEngineering changes made to define, analyze and classify the characteristics in order to improve hair contracting parties for engineering change and understanding its causes, there is no need to reduce the possibility of engineering change, but also to enhance the contractor's ability to identify engineering change foundation.Paper describes the relevant provisions of the domestic price adjustment of engineering changesMainly on our current engineering change price regulations introduced and analyzed, dealt with the application for the construction process of construction projects in the engineering change the principles and methods of calculation of price adjustments, the current projects of engineering in engineering change reasons were analyzed and summarized in order to improve Procurement status of engineering change sides calculate the price of a major controversy on.Papers by reference significant diversion tunnel engineering geological conditions of a hydropower station in Sichuan Province as a case to change the actual engineering, engineering changes after the price adjustment and valuation procedures for analysis and calculations, also lists the detailed calculations for engineering change the price for similar engineering changes help and practical value.
Keywords/Search Tags:Project, change, change the price, adjustment and application
PDF Full Text Request
Related items