| The full information of electric power production is the developing direction, the city grid power plan management decision system can effectively improve the efficiency of the development and management of scheduling programs, which providing rich data base and fast credible basis for decision making electricity market. By providing a relevant staff friendly, practical, professional, efficient information collection, management, publishing work platform, the management level of scheduling is effectively improved while the burden of work-related personnel is reduced. The dispatching operation standardization works orderly and efficient.Based on the current market environment, urban grid power program management decision system is developed in this paper. To achieve the company’s overall cost of purchasing electricity dynamic budget, the structure of the purchase of electricity is optimized. The costs incurred for the purchase of electricity were real-time statistical analysis by the auxiliary power system economic dispatch scheduling and decisions system. The contact line, month, ten-day, day, temporary and other transactions and trading electricity, power plants of the annual plan, and internet billing electricity, tariff, "Three" scheduling progress, energy alternative plan execution, electricity price adjustment and other relevant factors is taken into consideration for examination results of power plants. Docking system and the dispatching automation system, maximize automation is implemented.The management and decisions system for urban grid power in this paper is based on actual job requirements and planning and scheduling work to achieve a paradigm shift. By strengthening economic dispatch functions of the dispatch center,the cost of purchasing electricity grid company structure is optimized. Based on the "Three scheduling" on scientific and reasonable arrangements for power generation units, the power company’s power purchase costs are minimized. By reducing the "two rules" in the assessment of the plant and ancillary services compensation requirements, the concordant relationship between power corporation and power plants is established. |