Font Size: a A A

The Design Research On The QC Activity Plan Of The Installing Of Filter Plate In V-type Filter

Posted on:2017-06-13Degree:MasterType:Thesis
Country:ChinaCandidate:P XieFull Text:PDF
GTID:2322330488477953Subject:Engineering Management
Abstract/Summary:PDF Full Text Request
QC group known as Quality Management Group, In 1980 s, the QC team introduced into China as an effective method of quality improvement. After more than 30 years of development and promotion, QC group activities have played an enormous role in the quality management of all walks of life, gradually become an indispensable and important means of quality management of modern enterprises. QC group activity based on the PDCA cycle theory, using all kinds of quality management theories, around the problems existing in the scene, through factor confirming, countermeasures carrying out to improve the quality of the products, increase economic benefits and Improve staff quality. This paper expounds the theory and method of quality management, such as quality improvement, PDCA cycle and QC group activity, and combined with the engineering practice, introduced the control process of reducing the excessive rate of filter plate installation deviation of V filter.The main contents of this thesis can be summarized as follows:First of all, this article analyzed the project construction quality management and quality control etc. in depth, emphatically introduced the PDCA circulation theory and the use of quality control various methods.Secondly, the importance of filter plate installation, construction of key difficulties, and inspection and acceptance method for a comprehensive analysis of the V filter;By consulting the literature periodical, expert consultation, using the arrangement chart, the brain storm and so on, The main factors that affect the quality of filter board construction are filter board flatness deviation and filter board position deviation, which provide the basis for QC group activities.Again, with V type filter plate installation construction case, using the PDCA circulation method, improve the filter plate installation quality importance, analysis the causes and countermeasures of affecting the filter plate installation quality, draw a conclusion that through the quality process control could reduce the flatness deviation of filter board and the filter plate position deviation exceeding standard rate.Finally, through analysis measured data of filter plate elevation,location and so on, the quality inspection results and economic analysis QC activities carried out before and after, shows that carry out QC group activities, not only improves the filter plate installation quality but saving the cost of the project.
Keywords/Search Tags:Construction quality, QC group, PDCA cycle, Filter plate installation, Violation rates
PDF Full Text Request
Related items