Budget Management Research Of GZ Hydropower Project Investment

Posted on:2017-12-17Degree:MasterType:Thesis
Country:ChinaCandidate:X L JuFull Text:PDF
GTID:2322330512464419Subject:Engineering
Abstract/Summary:PDF Full Text Request
In recent years, with the rapid development of market economy and science and technology, including the growing of traditional manufacturing, services and the Internet industry and many other industries such as the demand for electrical energy, whereby energy supply to power companies as well as new requirements. Available as a major provider of electrical energy, hydropower construction project has been one of the countries and attaches great importance to the social direction. At the same time, due to the huge investment in hydropower projects, it needs to be strict management to ensure the normal progress of the project. GZ hydropower complex geographical location, huge quantities, whether in the project on the basis of careful investigation to develop a reasonable budget is essential to invest almost. Today, there have been many theories to hydropower project investment budget estimate and binding theory, in practice the actual production process has been perfected and improved. Order from a holistic perspective on investment GZ hydropower construction projects to manage and control, aiming at the actual background of the project, the combination of theory and practical experience, scientific methods for the management of the investment budget estimate projects a more in-depth study.GZ hydropower construction projects have abundant water location is characterized by long duration, huge quantities, large scale, and therefore investment budget estimate will become an important part of the project it does not have to be small. For the government, the investment budget estimate to ensure the completion of the national budget in the least possible shelf life of the corresponding infrastructure, to facilitate people's lives; for developers, reasonable investment budget estimate enable it to maximize profits. Based on the above premise background, investment budget estimate GZ hydropower construction projects were studied. First, a more complete overview of the theoretical basis of budget management; followed by the actual situation GZ hydropower project is designed based on the investment budget estimate GZ hydropower station, and one of the issues were discussed; Finally theoretical knowledge of project management and data relevant experts, the existing investment budget estimate of issues were discussed solutions. In short, GZ hydropower construction projects, the investment budget estimate standardized process management is not only related to the project management process, including schedule management, quality management, and cost management, significantly increasing the economic efficiency; while improving the investment budget estimate reasonable, to maximize the realization of the national policy advocacy resources underutilized.
Keywords/Search Tags:hydropower, investment, budget estimation, project management, cost control
PDF Full Text Request
Related items