Project Scheduling And Control Of The 11th Dormitory Construction Engineering In Shenyang Institute

Posted on:2014-03-31Degree:MasterType:Thesis
Country:ChinaCandidate:L WangFull Text:PDF
GTID:2322330512971284Subject:Project management
Abstract/Summary:PDF Full Text Request
Project in the human society has existed for a long time.Along with the progress of human society and the improvement of social productivity,people in some engineering quality and implementation methods are put forward new requirements and expectations,and when the same time social productivity can satisfy these requirements and expectations,the project is produced.So project management is has a long history of culture,people to transform the nature,production and practice of system behavior and process,n recent years,with the continuous development of higher education reform,student gross enrollment rate increases,to promote the continuous development of the university town,many colleges and universities through the integration of the new campus replacement gained new development,burst of vitality,accompanied the expansion of the student,the student dormitory supply imbalances have emerged in various colleges and universities have student dormitory for the construction,SG on the 11th floor,is one of a dormitory project.Every construction project is a turnkey system engineering,must have their own plan a complete guarantee system.It requires application of a systematic approach to analyze the various factors that affect the progress,reasonable arrangements for supply of resources,to consider appropriate measures,including organizational measures,technical measures,contractual measures-economic measures and information management measures to achieve the schedule to complete the project,save the projectcosts for the purpose of preparing the optimal construction schedule in the implementation of the plan construction,always check the actual progress of the construction,and compared it with the schedule,if there is bias,which analyzes the causes and durationimpact,identify the necessary adjustment measures,modification of the original plan,so the cycle continuously until project completion and acceptance.In this paper,on the basis of project management knowledge,For SG dormitory building no.11 of the specific conditions of the construction project,in this paper,the design scheme,equipment,scale,project implementation plan,organization and management and human resource configuration and so on to conduct a comprehensive analysis,in order to schedule control as the main starting point,the SG no.11 dormitory building construction project in-depth research and analysis,find out the key factors influencing the construction of the project schedule,on this basis to develop detailed project schedule,according to the plan organization have rhythm,balance,continuous construction,in the process of project implementation in a timely manner to understand the actual progress of the project,the construction plan of dynamic control and optimization,reasonable allocation of various kinds of resources in order to solve the specific problems in the construction process,and achieved the effective control of the construction period,reduce construction cost,construction quality assurance purposes.
Keywords/Search Tags:project management, critical path, progress management, progress control
PDF Full Text Request
Related items