Font Size: a A A

Study On The Application Of Information Management System Under The Conditions Of Internet For Large-scale Construction Project

Posted on:2017-09-30Degree:MasterType:Thesis
Country:ChinaCandidate:Y W FengFull Text:PDF
GTID:2322330515965608Subject:Project management
Abstract/Summary:PDF Full Text Request
The third plenary session of the 18 resolution clearly put forward: "we will improve the mechanism of urbanization healthy development of the system,adhere to the new path of urbanization with Chinese characteristics,promote the human-centered urbanization,promote the coordinated development of big and medium cities and small towns and".Promote the new urbanization construction is given priority to with investment in infrastructure construction of large construction project investment,these large construction projects involved in the project information is more complex,and the backward management means and information does not flow easily lead to bidding opaque,project bidding fraud,optional change planning,any subcontracting project design and construction of the missing records,contract number disorder and engineering construction materials illegal procurement illegal discipline phenomenon began to appear,this will seriously affect the quality of the project.Thus,to improve the modern large construction engineering project management information system become an imminent task.This article in view of the current lack of large construction project information management system of the status quo,first of all,with the domestic and foreign related research as the breakthrough point,the system elaborated the theories of large construction project information management,then gives a brief introduction of research results;Secondly,in this paper,by means of field survey to collect data,and after the reliability and validity analysis to factor analysis of data,extract the main dimensions of large construction project information demand.Again,according to research results,based on the Internet to build "three levels,multiple subject" large construction project information management system,at last,according to the author's working practice,in tianwan nuclear power station construction project in jiangsu province for example,is analyzed based on the Internet "more than three levels and subject" the realization of a large construction project information management system.Field research in this paper,the research shows that: first of all,the results of factor analysis,the demand of large construction project information management can be divided into four categories,the first major categories are elements of project decision-making management,which accounts for 36.161% of variance,the remaining three categories,respectively for the daily management of high-level project management content,content,and project management system content,the variance ratio of 25.681%,12.566% and 9.023% respectively.Secondly,according to the results of empirical research,the Internet technology applied in other industries,this paper set up the large construction projects of the "three levels and four dimensions" has a large amount of information integration and information management model reflects the rapid fast,multi-sectoral cooperation advantages,large construction projects can be a good service.Finally,the article in tianwan nuclear power station as an example,proves the validity of the model and realizability.However,in this paper,the design of the "three levels and four dimensions" information management model while convenient operation,large amount of information processing.
Keywords/Search Tags:Large construction projects, Information management mode, Internet technology, The three levels and four dimensions "model
PDF Full Text Request
Related items