Research On Schedule Planning And Control Of Construction Project Of Emei AM Hotel

Posted on:2015-12-31Degree:MasterType:Thesis
Country:ChinaCandidate:W LiFull Text:PDF
GTID:2322330518970904Subject:Engineering
Abstract/Summary:PDF Full Text Request
In the background of China’s rapid development of Stars Hotel industry,because the Stars Hotel’s longer development cycle and slower withdrawal of funds characteristics are remarkable,doing a good job in the hotel development progress control in the next period of time is very important.This paper mainly uses the dynamic control principle to do the research of construction project schedule control for Emei AM hotel.Firstly it gives a brief introduction about the project,and expounds the main factors that affect the progress in detail,then compiles the scheduled plan of Emei AM hotel construction projects and draws the double-standard code at the net work for the project.According to the deviation of actual progress and plan progress,the paper compiles the forward line graph for the project,and then applies the lapping network technique to adjust the schedule of Emei AM hotel construction project to avoid the influence on construction time schedule.Because of the early lag,the paper discusses the measures to guarantee the project schedule for the Emei AM hotel construction projects finally.In this paper,the theoretical method is applied to the practical engineering project,and puts forward the reasonable and effective solution method.It has a certain reference value for the hotel construction project and provides reference for construction engineering project management.
Keywords/Search Tags:scheduling plan, scheduling control, hotel construction project, technique of lapping network
PDF Full Text Request
Related items