Font Size: a A A

The Research On The Post-Games Utilization Of Beijing And London Olympic Venues

Posted on:2018-01-29Degree:MasterType:Thesis
Country:ChinaCandidate:Y B WangFull Text:PDF
GTID:2347330518981041Subject:Physical Education and Training
Abstract/Summary:PDF Full Text Request
The Olympic Games is a prosperous time in the history of human development.Every Olympic Games bid is a very intense competition.As a city's success will bring the city huge influence,visibility and reputation of the candidate cities in the world will be promoted.In the Olympic effect leads,the officials,athletes and visitors such as stream of people lead to the development of local tourism.At the same time,the Olympic bid cities attract the government's financial capital and funding for construction of urban infrastructure and venues,on the improvement of the urban environment and public infrastructure has a positive impact.The Olympic Games is not only the highest stage of the international sports competition,and is a very complex economic phenomena.In burning half a month after the shoot the lamp to extinguishing of the Olympic flame and starlight,invest huge Olympic stadiums after the use case,all people have to become a problem.Back a huge burden for the games in the history of not a few of examples,namely after the Olympic Games host city of the economic growth rate slowed down or even investment too big economic burden due to host the Olympics going into reverse.Olympic stadiums after the use of the good or bad evaluation become a host city level and evaluation plays an important role in the success of the games.This article mainly USES the literature material method,logic analysis and other research methods,based on the large Beijing and London Olympic Games stadiums after the use of case analysis,conclusions are as follows:1.Current our country large stadiums after the utilization compared with western developed countries there is a certain gap.Part of the utilization ratio is very low,not explored in accordance with its own operating way.High-profile mainstream the facility operation conditions of a project is better.2.The operation mode of the part of the stadium with The Times,conformism.Low degree of marketization,profitability is poor.Services provided by the venue can't meet the requirements of the public and commercial requirements.Venue managers did not follow the progressive era,actively explore new mode operation.3.Lack of domestic professional venue management talent and team.The existing management company can not meet in our country large stadiums after the operation needs.In the process of the construction of large stadiums forward-looking,increasing the difficulty of large stadiums after the operation.
Keywords/Search Tags:The Olympic Games, Venues, Post game utilization
PDF Full Text Request
Related items