| In recent years, our country pay more and more attention to performance evaluation,In the "twelfth five-year" development plan of audit,"To establish a financial performance evaluation system by the end of 2013 and other performance method system."Although the state attaches great importance to the performance evaluation, but in practice, the performance evaluation is affected by the traditional financial will still stay the performance evaluation on the authenticity of economic business, compliance, legitimacy and completion settlement, the performance evaluation of the effect is not obvious.Project performance evaluation of state-owned enterprises is not yet mature, the theoretical study also is less, this needs to establish a set of scientific performance evaluation system to measure whether the completion of the project is effective.On the basis of the research literature at home and abroad, this paper summarizes the basic theory of performance evaluation of state-owned enterprises project and the practical significance, and the theory instruction practice,Technical renovation project performance evaluation system of concentrator with a company as the research object, comprehensive analysis of the system and the cause of the problems existing in the current situation and problems, and build the system of state-owned enterprise performance evaluation system of engineering projects.Problems mainly is the lack of performance evaluation concept, set the index is not comprehensive, using inappropriate, evaluation method and standard is not scientific. Rebuilding the system including the object and content of performance evaluation, the evaluation targets and indicators and the evaluation standard and methods, etc., which focuses on the evaluation index, weight set and evaluation methods.For the construction of index system, from the economy, efficiency, effect, fairness, and environment five aspects to set up the index; Weight is set using analytic hierarchy process (AHP), and eventually the performance evaluation results of calculation using the comprehensive scoring method. The purpose of this paper is to build a suitable performance evaluation system of state-owned enterprise of the project, for other state-owned enterprises after the performance of the project is to provide the reference for perfecting the evaluation system. |