Research On The Risk Management For Electrical Equipment Tendering Project Of TBEA Company's China Engineering

Posted on:2017-06-27Degree:MasterType:Thesis
Country:ChinaCandidate:S Y LiFull Text:PDF
GTID:2349330512957894Subject:Engineering
Abstract/Summary:PDF Full Text Request
Since nineteenth Century by Faraday since the principle of electromagnetic induction, invented the world's first electric power generator, has entered every corner of human life and work, and play an important role, not every hour and moment is changing our way of life, improve the efficiency of human activities. In particular, since twentieth Century until today, the construction of large-scale transmission lines around the world, the domestic and foreign power industry has been developing by leaps and bounds. Chinese nearly twenty years to accelerate the construction of "five pay eight straight UHV, mutual supply between South and North, West to East, the Three Gorges project, cross regional networking project,driven by the rapid development of world power grid. As the power of China's national Power Grid Corp, through deepening the power grid planning research,draw on the Internet model, first proposed and actively promote the world power grid into the era of internet. Is expected in the "13th Five-Year" period, the national economic development of the environment, our country will show a spurt of growth of electric power project construction. China's power equipment enterprises in order to meet their own capacity needs, go out to Africa, Latin America and other underdeveloped areas, focusing on the coordination and development of the world's power supply and power shortage.Tebian company as a national backbone power equipment enterprise China few more has a qualified engineering general contract of electric power, power andgood environment due to the rapid development of power grid construction, through continuous abroad based power plant EPC turnkey project, pulling the double growth of enterprise scale and economic benefit. However, because the company is a manufacturer of power transmission equipment tiebian started for a late start, less experienced general contracting business, and itself is transformed from the old state-owned enterprises, compared with the same industry company, internal system ills long legacy, and mature talent shortage, project personnel for risk prevention and control measures and means of understanding are more missing, causing Tebian company will face many difficulties in the process of project construction. Which is being implemented in recent years, the Chinese project bidding project is a typical example. Tebian company from the beginning of 2014 by means of public bidding,the implementation of the China construction project, all materials and equipment in addition to the China construction projects required to adopt procurement bidding,this way for the company to save the special huge investment costs. However, in the process of the whole electric equipment tendering still hidden many risk factors, the potential risk to the company in the electrical equipment bidding will cause great impact. How to identify the risk of project electrical equipment bidding, and to establish a perfect risk management system is a subject worthy of study, but also the focus of this paper to explore the issue.At present, with the popularization and application of project management knowledge, project risk management has risen to the height of enterprise strategy,the meaning of project risk management is also more and more attention. Enterprises should continue to inject the concept of project management risk assessment, in order to provide a reliable guarantee for the successful completion of the project.Therefore, this paper introduces the risk management methods of science has a very important meaning to ensure the Project Electrical Equipment Tendering Company TBEA Huaxia project success. In this paper, the bidding management theory, riskmanagement theory, equipment bidding risk encountered by China in the process of engineering construction as the research object, on the basis of summing up the historical experience and collected a lot of risk cases, through the risk management research of Chinese engineering company Tebian electric equipment tendering project, identify the tender all kinds of risks existing in the project, through the implementation of effective evaluation of various risk characteristics and causes, and then puts forward corresponding control measures and risk prevention programs,which can not only ensure the smooth implementation of the project, reduce the construction cost of the project, improve the Tebian company's economic benefits,but also can provide the necessary reference value of risk the management of similar projects in the future of the other power enterprises.
Keywords/Search Tags:equipment bidding, project risk management, risk identification, risk evaluation, risk control
PDF Full Text Request
Related items