Font Size: a A A

Research On Optimization Of Material Management Of North Kangping In Shen_Si Highway

Posted on:2018-08-16Degree:MasterType:Thesis
Country:ChinaCandidate:Z B YangFull Text:PDF
GTID:2359330515476546Subject:Engineering
Abstract/Summary:PDF Full Text Request
In the life cycle of the construction project,there are many constraints,such as resource,policy and environment.And it is necessary to carry out the whole process of project construction and system planning to make the whole project to achieve the quality of security services and other requirements.The process will involve materials,equipment and other material control and other aspects of management and control.Therefore,in the process of engineering construction,the material as the sustainable development of the project is the most important.Only to strengthen the control of materials,to reduce the project cost,and shorten the duration of the project and improve the quality of the project,and then provide a solid guarantee for the smooth progress of the project.As an important part of Shen-Si highway,Shen Kang Highway is a highway network in Liaoning north trunk line.And north Kangping in Shen-Si Highway project is a typical demonstration project of the north area.Therefore,the research of the project materials management and control optimization problem has important theoretical significance and practical value.At this stage,the project construction companies are not aware of the importance of material management and control,still using the traditional methods and methods of materials management,which led to the development of materials in the project did not play an effective value.However,the construction project will last a long period of time,and there are many factors and the construction processes that can't forecast.If we ignore the effective management of goods and materials,it will directly affect the completion time of the project.The research on improving the north Kangping in Shen-Si Highway project management level will help the smooth implementation of the project.At present,Hope that through the completion of this paper can be resolved,Solve the problem of.northKangping in Shen-Si Highway project project material management and control,So as to achieve the help of the entire project.At the same time,also for other related,similar projects to provide some case support.In this paper,in the analysis process of north Kangping in Shen-Si Highway project,first of all,we discuss the significance of the study of the problem.On the basis of it,this paper started with the plight of the status quo of north Kangping in Shen-Si Highway project,then discussed the project material management ideas to improve it.The paper found that there are some problems such cost management,time management and quality management etc..Therefore,based on these analysise this paper proposed some corresponding optimization strategy of improving project quality,materials management level,the promotion of material management in new technologies and innovative materials control model to achieve the overall optimization of project material control.This paper do the research on optimization of material management of North Kangping in Shen_Si Highway,and included transportation costs,transportation time and material risk and quality management,and realized the integrated management of north Kangping in Shen_Si Highway.At the end of this paper,we evaluated the optimization of material management the north Kangping in Shen_Si Highway so we can offer some evidences for the subsequent implementation of the project.
Keywords/Search Tags:highway project, material management, optimization scheme
PDF Full Text Request
Related items