Research On Risk Management Of EPC General Contracting Project Of Social Housing In Cameroon

Posted on:2018-01-22Degree:MasterType:Thesis
Country:ChinaCandidate:G LiFull Text:PDF
GTID:2359330515979272Subject:Engineering
Abstract/Summary:PDF Full Text Request
Along with the rapid development of Chinese economic,China overseas building expansion process of the construction industry is faster,then strengthen;Similarly,International engineering contracting market for the business development of the enterprise is also higher and higher demands are proposed.Due to the comprehensive benefit,resource allocation,the owner tendency,and many other factors,makes the EPC general contracting mode in the international engineering gradually become the mainstream mode.As a result,many experts and engineering professionals for EPC project management pattern began to strengthen the attention and research,the international engineering contracting market compared to the domestic market,which has the characteristics of the risk factors,more and more complex.Therefore,to use effective means to avoid to face the corresponding risk will be decide whether or not a Chinese construction companies in the international project contracting market is the key to winning.Standing in the point of view of project management,EPC mode allows the parties involved clear responsibility,ensure the engineering quality effectively;Standing in the perspective of the owner and the EPC mode can make its from multifarious,the liberation of the happenings in project management;Stand in the Angle of the general contractor,EPC mode can make it gain greater profit opportunities.However,profit and risk coexist,the profit as the general contractor and right ascension,project risk faced by chance also greatly improved.It was also because the characteristics of the EPC project risk big profits high,in the construction industry also encountered many problems in applying the model.This paper deeply analyzes the EPC mode,on this basis,according to the risk management process of the EPC model of risk identification,analyzing main risk to the contractor,and to focus on the project risk analysis in each stage of the EPC.Using expert scoring method,analytic hierarchy process(AHP),weights of various risk factors of EPC pattern discrimination,according to risk level sort out various risk factors on the impact of the project,and finally to the project risks by solution is given.
Keywords/Search Tags:EPC, General contracting, Risk management, The project management
PDF Full Text Request
Related items