Font Size: a A A

Research Of Project Bidding Decision-making Process Analysis And Bidding Decision Model

Posted on:2018-08-02Degree:MasterType:Thesis
Country:ChinaCandidate:J MaFull Text:PDF
GTID:2359330536468644Subject:Project management
Abstract/Summary:PDF Full Text Request
At present,the bidding system is the most widely used in numerous transactions,a transaction of more mature,while also being applied at the international level.Of the bidding system,bidders in accordance with the relevant procedures and requirements for bid,elected to win business.It is obvious that such basic features of open,competitive and fair.China's bidding system for a short time,experience is not very rich,management and decision-making levels is still very limited.Therefore,many bidders at the time of bidding,or substantially in accordance with the subjective experience of the way the decision to bid or not.With the increasingly fierce competition,scientific and effective bidding decision has become a construction Enterprise bid and the key to profit.Bidding for the entire process of bidding management and decision-making levels of test,and is related to the interests and development of important links.Therefore,to study on bidding decision making of great theoretical and practical significance.Based on the outcome of research,bidding decisions of enterprises can be divided into three phases,namely the preparatory stages,bid decision analysis and evaluation stage,to bidding decision focusing on the entire program of study focuses on decision analysis phases were studied,and sequence analysis,based on the model of bidding decision of compound base price bidding of the risk margin.Finally,as a typical example of an empirical analysis of bid activity,to demonstrate the usefulness of this article.
Keywords/Search Tags:Construction engineering market, Bidding system, Bid Decision, Decision Model, Post-evaluation
PDF Full Text Request
Related items