Study On Agent Construction Management Of Project

Posted on:2018-07-14Degree:MasterType:Thesis
Country:ChinaCandidate:F F ZhangFull Text:PDF
GTID:2382330545497267Subject:Architecture and civil engineering
Abstract/Summary:PDF Full Text Request
The project construction management system is the whole process of feasibility study,survey and design,by the project sponsor by qualified projects for project supervision and construction,and complete the task of building construction project and in accordance with the design requirements,the project until the completion of acceptance after delivery of the project construction management mode with people.It is characterized by the transition from the small production management mode to the project specialization in the past,and the engineering technology and management methods of the project tend to be modernized.Since 2004,the practice of agent construction system has been carried out all over the country.Generally speaking,there are still some problems such as "construction and management" is not really separated,the degree of socialization is not high,and management is not standardized.Based on the construction project of special construction project implementing agent construction management program as the research object,the research method of comprehensive use of research planning how to improve the efficiency of government investment,the use of risk assessment analysis principle model of BP network of the construction risk factor,establish more scientific project procedures,and strictly according to the procedures the research and practice of the control of the construction bidding,design of contract plan,risk assessment and other key aspects of the analysis.Research and practice results show that through the implementation of the project construction agent system,not only can rely on the generation of resources construction company,improve construction management professional level,the project cost,schedule,quality,safety and environmental protection targets,effectively inhibit the long-term existence of the "super size,super standard,over budget issues,eliminate corruption in construction projects also,from the fundamental solution to the construction unit staff Co.,no energy,no experience,lack of professional and technical personnel seconded to other units affect the normal working order and other practical problems.Conclusion the government proposed to establish a sound scientific and efficient operation of the market,fund supervision mechanism,evaluation system to promote the project,development of supporting the market,improve the social security system project construction management policies,and strengthen the preparatory work coordination,strengthen the construction of the implementation stage of management,completes the acceptance of delivery after the quality guarantee period of defects repair work for the project implementation of the project provides a reference.
Keywords/Search Tags:engineering, construction project, generation system, management procedure, bidding, contract scheme, risk assessment
PDF Full Text Request
Related items