| Standardize the management of transformer engineering is an important problem that has puzzled the management of power transformer engineering.Based on the actual situation of engineering management in power company,this paper designs a set of information management system which conforms to the requirements of substation engineering management in power company,combining with the development of project management at home and abroad.This system is based on the software and database technology.Based on B/S architecture mode,no need to use personnel to install client programs,the development techniques of hibernate,spring,struts and so on are based on J2 EE technology,which realizes the system business logic processing,using relational database Oracle as the system data storage,the JSP dynamic page is used in the page processing to realize the dynamic interaction of data.The whole process management of this system is based on the Power Transformation project,and the main function relates to the quality,safety,and the premise.Project and cost management and many other aspects,covering the project’s side page,the establishment of a project based on the main line of management means,involving materials,quality,safety and many other aspects,in the construction process management materials,materials,contracts,and management of construction quality,safety and other aspects of work.Through this means to make the project in the construction process to be further standardized,to ensure that the relevant information of the project is reasonable,so that the power company management project capacity,the level of effective improvement,in the efficiency of the greater improvement,while also making management costs significantly lower.This article is mainly based on the software engineering idea to design and implement in the description.Firstly,this paper analyzes the background and significance of the topic,and puts forward the necessity of constructing the system.Secondly,it analyzes the related technology used in construction management system,and analyzes the main system requirements.In addition,the main ideas and architectures of the system are outlined,and the relevant contents of the design system database and function are described in detail;Thirdly,the implementation process of designing this system is described in detail,and the realization process of the system used and its important function and the interface and code are introduced.Finally,the test environment,test method and test content of the system are described,and the test results are summarized. |