A Power Substation Construction Enterprise Project Cost Management Optimization Research

Posted on:2018-09-22Degree:MasterType:Thesis
Country:ChinaCandidate:X W LiFull Text:PDF
GTID:2322330515482467Subject:Engineering
Abstract/Summary:PDF Full Text Request
In recent years,the rapid development of power industry and the rapid growth of national economy,causing all sorts of equipment,materials and energy prices.Resulting in electric power construction enterprises in the transformer substation project equipment cost,cost of raw materials and artificial cost has been trend,so that the transformer substation construction project cost rising,electric power construction enterprise survival pressure increasing.In order to survive,to maximise profits,power construction enterprises must strengthen the management of project cost.In this paper,A power substation construction enterprise project cost management plan as the research object,the in-depth analysis and research on its solution.First of all,the research background and research significance of this paper,firstly,and then the general situation of the electric power construction enterprises and the transformer substation construction project of A brief introduction.Combined with A power substation construction enterprise project cost management plan specific put forward the main content of the thesis research and research ideas.Secondly,the principle of electric power engineering cost management including projects,project cost management and the concept of using the method of project cost management.Then,puts forward the substation engineering standards and requirements of cost management,substation of A electric power construction enterprise project cost management plan was introduced and in-depth analysis,put forward scheme of the lack of A reasonable decision method and the problem of construction cost management is weak.Then,in view of A electric power construction enterprise problems existing in the substation project cost management plan and puts forward Suggestions for the optimization design and optimize the process of cost management and organization management,and combine the theory to A substation electric power construction enterprise project cost management scheme in practical application.After using the above theory,combined with the engineering example,analysis of the new scheme of A electric power construction enterprise substation to improve the situation of engineering cost management and economic effect.After,according to A electric power construction enterprise own actual situation,putforward to strengthen enterprise organization and management,improve the incentive and constraint mechanism and improve the project management team safeguard measures such as cost management ability,so as to guarantee A power substation construction enterprise project cost management plan of the implementation of the optimization design.Finally,summarizes the full text,the paper expounds this article conclusion,namely A power substation construction enterprise project cost management scheme optimization design for A power construction enterprises to strengthen internal management,increase economic efficiency,promote the competitiveness of the market has obvious effect and significance.
Keywords/Search Tags:Electric power construction enterprise, Substation project, Engineering cost management
PDF Full Text Request
Related items