Research On The Progress Control Of Weinan From The Yellow River Water Supply Project

Posted on:2019-08-17Degree:MasterType:Thesis
Country:ChinaCandidate:L LiuFull Text:PDF
GTID:2382330548489395Subject:Engineering
Abstract/Summary:PDF Full Text Request
With the strong support of relevant national policies,the rapid development of the Guanzhong-Tianshui economic circle in recent years led to the gradual emergence of a number of batches of modern industrial parks.The supporting water supply facilities are also in urgent need of improvement.Existing water sources can no longer meet the water load in the area..The construction of cross-regional water transfer,water storage,and water distribution facilities is imminent.Pucheng County is located in the hinterland of the Guanzhong Plain,and agricultural irrigation systems extend in all directions.The improvement of water saving measures in recent years has saved a great deal of agricultural irrigation water,and this wealthy water can serve industrial production.The purpose of the construction of the Yellow River Water Supply Project in Weinan City is as follows.The Yellow River Water Supply Project in Weinan City is a project to be constructed first in the industrial park,and it will focus on solving the facilities of the Wanbei Coal Chemical Industrial Park,especially the large-scale drinking water project Pucheng Clean Energy Chemical Co.,Ltd.,with a 700,000-ton/year polyolefin project.After the construction of the device area has been fully completed,schedule control and schedule management have become critical in order to ensure on-time commissioning.This project is based on on-time test,on time and production is a prerequisite,in the construction process to improve and optimize the schedule management system,cost management system,quality management system,they complement each other,which improve the progress management system management is particularly important,is to seize The market will take the initiative to safeguard the sustainable development of the market economy in the region.It is of great theoretical value and research significance to study the progress control of the Yellow River water supply project in Weinan City.Based on the analysis of a large number of documents,this paper analyzes the current status of research on progress control at home and abroad and the frontier theory of progress control research,and finds the most appropriate research method for studying progress control of the Yellow River water supply project in Weinan City.Because the Yellow River Water Supply Project in Weinan City is a large-scale system project,schedule control,cost control,and quality control are organically combined.There is a certain one-sidedness in performing a single study.This article selects the value-added method to analyze the progress of the Yellow River Water Supply Project in Weinan City.The control of the situation can not only make in-depth analysis of the progress control,but also take into account the cost and quality.It has certain practical significance and can provide theoretical support for actual project management.This article first analyzes the problems and shortcomings in the progress control of this project during the research process.When there is a deviation,it uses the earned value method to find the problem in a timely manner and analyzes and corrects the problem until the progress plan goal is successfully achieved.To realize the value-added of the project,this paper provides a reference and reference for the progress control of the similar large-scale projects for the progress control application of Winning Water Supply Project in Weinan City.
Keywords/Search Tags:Water works project, progress control, earned value method, large-scale project
PDF Full Text Request
Related items