Font Size: a A A

Research On Risk Management Of YC Irrigation And Drainage Pumping Stationrenovation Project Of HX Company

Posted on:2019-05-19Degree:MasterType:Thesis
Country:ChinaCandidate:Y H ChenFull Text:PDF
GTID:2382330572451771Subject:Business Administration
Abstract/Summary:PDF Full Text Request
Project risk management in China started relatively late.And it was gradually introduced into the country after the development of western countries.But the overall development rate is relatively fast.At present,risk management has begun to play a role in project management in various fields of our country.Water conservancy project is one of the most potential projects in many engineering construction.It has the characteristics of less pollution and high efficiency.But the construction of water conservancy projects also exist large investment,long construction period.They must be completed by multiple units of the joint construction,but also by the influence of various natural disasters and accidents.Large probability of harm accident is relatively high.There is uncertainty in construction risk.In view of the various risks in the construction of water conservancy projects,the Chinese government has taken a variety of measures to prevent and try to maintain the safety of water conservancy projects.The current development of China's risk management of water conservancy projects in many scientific research personnel efforts have achieved good results,but the overall situation is too much emphasis on the process of investment management.The degree of attention to other important engineering safety management,schedule management and quality management is not enough.This paper mainly focuses on the project risk management research of HX company's renewal and transformation project.The first part is the introduction.This paper mainly introduces the background,significance,purpose and main scope of this research,and summarizes the related literature.It introduces the research status and research methods of risk management both at home and abroad.The second part is the basic theory of project risk management.First of all,the meaning and content of risk management,characteristics and risk management process are introduced.And then the characteristics of water conservancy projects are analyzed.The third part is the irrigation and drainage pumping station renovation project risk identification,introduces the general situation of HX company's renovation project,including the general situation of the project,the characteristics of the meteorological and hydrological conditions and the engineering.The article also explains the main methods of risk identification,the basis of risk identification and the identification process,and finally classifies and analyzes the risk factors.The fourth part is the risk analysis and evaluation of the irrigation and drainage pumping station renovation project.The article explains the theoretical basis of risk analysis and evaluation and the method of evaluation.It mainly includes qualitative analysis and quantitative analysis.The fifth part is the risk prevention and response of the irrigation and drainage pumping station renovation project.This part mainly introduces the method of risk management,including risk avoidance,risk mitigation,risk isolation,risk transfer,risk retention.The sixth part is the conclusion,which draws the main conclusions of the study,tells the inadequacy of the current research and the future outlook.
Keywords/Search Tags:water conservancy project, YC irrigation and drainage pumping station, project management, risk management
PDF Full Text Request
Related items