| According to the 12 th Five-Year Plan for Energy Conservation and Emission Reduction,the State takes the development of green energy,the reduction of energy consumption and the reduction of total emissions of major pollutants as important indicators for the determination of national economic and social development,and takes energy conservation and emission reduction as its main work.The main ways are to adjust the economic structure,adjust the overall way of energy use and change the economy.The mode of development.We will actively develop clean energy sources such as wind energy,solar energy and solar power generation.Through the analysis of the project case,the project cooling load is calculated,and the table is sorted out.According to the load,the equipment selection calculation is carried out for the conventional air conditioning system and the ice storage air conditioning system,and different equipment selection is obtained for the conventional air conditioning system and the ice storage air conditioning system.According to the selected equipment,the operating energy consumption is analyzed,and different operating costs are obtained under different refrigeration host loads.According to the operating costs,the comparison is made by incremental analysis method,and the ice storage air conditioning system is applicable to this project case when the local peak-valley electricity price ratio is more than 3 times the difference.This paper is of reference significance to the design and demonstration of ice storage air conditioning system and has played a guiding role. |