Font Size: a A A

Scheduling Control Method In Thermoelectricity Plant Engineering Design Application

Posted on:2009-02-08Degree:MasterType:Thesis
Country:ChinaCandidate:T LiFull Text:PDF
GTID:2382330572458915Subject:Industrial engineering
Abstract/Summary:PDF Full Text Request
Combined Heat and Power(CHP)plays a noticed role in saving energy sources,protecting environment and improving economic benefit.The countries in Frigid Zone pay great attention at the development of CHP.The history of thermoelectricity plant in our country has been for several decades,and has developed quickly under the support of the government.With the city in which the thermoelectricity plant lies develop and expand in area,the heat and power supplied by thermoelectricity plant is far away from meeting the demand,so many expand projects are under construction.In case of this situation,this paper focuses on the new project of the thermoelectricity plant,looking deeply into the scheduling control and management.Project Management is a new field of management,which is used to plan,control and adjust a project of industry or business.Scheduling Management is the core of Project Management,which is playing an important role in the whole process.It can control the schedule,cost and quality,which help us to achieve the aims of reducing cost,improving efficiency and ensuring quality.Based on the research on the relative lectures about the project management,this paper analyzes the status in quo of project management domestic and abroad;demonstrates the basic meaning-of the project scheduling management,and then compares the differences between the thermoelectricity plant and other firms;analyzes the characteristics on the new project of the thermoelectricity plant,find out an operating scheme on the scheduling management of new project of the thermoelectricity plant;and does a demonstration research on the new project of Xinghua thermoelectricity plant;finally points out the problems that the project may merge during the process being under construction,gives some suggestions,which would have passive effects on the firms in the same and relative industry for more efficient project management.
Keywords/Search Tags:Thermoelectricity Plant, Engineering Design, Scheduling Control
PDF Full Text Request
Related items