Font Size: a A A

Research On Cost Management And Control Strategy Of Civil Engineering Project

Posted on:2019-08-22Degree:MasterType:Thesis
Country:ChinaCandidate:F XuFull Text:PDF
GTID:2382330596953526Subject:Architecture and civil engineering
Abstract/Summary:PDF Full Text Request
As a specific requirement of enterprise engineering projects,the cost management of engineering projects is to estimate,plan,control,account and assess whether the actual cost of the project is within the budget scope.Project cost management plays a very important role in project management of construction enterprises,and it is also the core of project management.Project cost profit and loss has a direct impact on project economic results and actual profits of enterprises.With the increasingly fierce competition in the market environment,construction enterprises mostly take advantage of competitive means to reduce costs as much as possible.With the help of advanced management mode and advanced management methods,the project cost can be effectively managed.It is also a guarantee for construction enterprises to obtain profits,and at the same time,it can create a more standardized market environment for the whole construction industry.Transformer substation civil engineering plays a very important role in cost management of construction group.Compared with the traditional civil engineering projects,the cost management of this project not only pays attention to process standardization control,but also needs to ensure the integrity of process data and detailed data.There are a lot of data and literal data as the basis for project cost prediction,planning,control,analysis,accounting,assessment and other links.Through the in-depth study of this project,it provides an effective reference for similar projects of Construction Group,makes a brief analysis of the background,purpose and significance of topic selection,puts forward research ideas and basic research framework,at the same time,analyses the research methods and literature review of this paper,and analyses the current situation of cost management of Civil Construction Project.Analysis of the causes of the problem,and put forward the corresponding cost control strategy.Through the systematic research process,this paper puts forward the civil engineering project cost management and control improvement countermeasures and suggestions: Firstly,put forward civil engineering project cost control strategies and suggestions,that is,process management for the whole process of S civil engineering project cost control,innovation of civil engineering project cost control.Systems,clear cost control methods of core civil engineering projects,and build a more scientific cost assessment system.Forcivil engineering project cost control improvement,this paper puts forward the issues that need to be paid attention to.
Keywords/Search Tags:cost management, transformer substation civil engineering project, cost control
PDF Full Text Request
Related items